David Chan asked David Chan answered

show schedule_down on pie chart with processflow

Hi I am using processlfow to model operator with time table. The operator is able to schedule down according to the time table but the down time is not recorded in the pie chart. The model is attached. Please advise how do I do it. Thanks.

Davidbreak-not-shown-on-dashboard-with-pf.fsm

FlexSim 17.0.0
processflowdashboardstimetable
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
David Chan avatar image
0 Likes"
David Chan answered

Hi, I realized that I need to turn on "Schedule Down" under the Utilization Analysis at the Dashboard for the operator. I am able to see the information after which.

David

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.