question

Hdz Bryan avatar image
0 Likes"
Hdz Bryan asked Sam Stubbs answered

Doing a sequence of activities

I want to do a sequences of activities by moving from point A to B but only after finishing the task sequence A with a task executers (operator)

FlexSim 17.0.3
sequence optimization
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Sam Stubbs avatar image
0 Likes"
Sam Stubbs answered

Process Flow is the best way to do exactly that. Within Process Flow you have more direct control over how and when tasks or series of tasks are executed. I would recommend going through the Process Flow section in the user manual.

Then go through the Process Flow tutorials. (User Manual > Tutorials > Process Flow) I think that the "Linking to 3D Models" and "Task Sequences" lessons in that tutorial will be especially helpful to you.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.