Hi, since FlexSim 2017 Update 2 it seems as if an Operator thats running a Travel Tasksequence given via Process Flow stops at every Point that it gets. This means if I want an Operator travel to a specific Destination via another sepcific NN it stops for a short Moment on this Point.
Until FlexSim 2017 Update 1 for me it worked that Operator didn´t stop until it reached the finish Point. So if there was some travel Tasks it stoped the first time on the last Destination.
Feature or Bug? And what do I have to do if I´m looking for the old behavior?