Average WIP Calcultaion

muhammed_fadil_ia
Not applicable
0 Views
5 Replies
Message 1 of 6

Average WIP Calcultaion

muhammed_fadil_ia
Not applicable

[ FlexSim 22.1.1 ]

How is the Average WIP Calculation done for a FlowTank ? Is it same as the average Content of the Tank ?

0 Likes
Accepted solutions (1)
1 View
5 Replies
Replies (5)
Message 2 of 6

patrick_zweekhorst
Not applicable
@Muhammed_fadil Ia , How do you mean Average WIP Calculation? Where do you see this calculation? If you can point us in the correct direction, or show an example model I am sure we are able to help you.

Thanks

0 Likes
Message 3 of 6

muhammed_fadil_ia
Not applicable

1653152511128.png

How is the Work in Progress Calulated for a FlowTank ? Also, if you Choose to view the average contnet it shows as


1653152664635.png


How is this value of Average WIP changing instantanously just wanted to know the underlying formula in it ?

0 Likes
Message 4 of 6

mischa_spelt
Not applicable

The content of a FloWorks tank is internally tracked with a kinetic tracked variable, as per the documentation the charts show:

the time-weighted average content (or WIP) of each object


Message 4 of 6

mischa_spelt
Not applicable
Accepted solution

The content of a FloWorks tank is internally tracked with a kinetic tracked variable, as per the documentation the charts show:

the time-weighted average content (or WIP) of each object


Message 6 of 6

muhammed_fadil_ia
Not applicable
Thanks @Mischa Spelt