From the Video.
The Task of OP5 :
Step1 Load from Queue1 >> Unload Queue4 >> Load In Multi1 and Work at It.
Step2 Load from Queue2 >> Unload Queue4 >> Load In Multi1 and Work at It.
Step3 Load from Queue3 >> Unload Queue4 >> Load In Multi1 and Work at It.
Then I assign capacity of OP5 at 3 Qty.
His task is : Load Queue1 >> Load Queue2 >> Load Queue3 >> Unload Queue4 for 1 Box >> Load In Multi1 and Work at It (Pick 2 Box)
I want he Unload 3 box at Queue4 and then Load In Multi1 and Work. By use 3D only.
Thank You.