AGV Charge Point and Package Delay

paddy_hands
Not applicable

Hi I Have uplaoded a model I am currently working on to trial the software. I Have a model collecting packages at the source and delivering them to the sink at a constant rate.

1) Can I add a charge station to the top left spur. I have tried to do this through the process floq template but cant seem to figure it out.

2) secondly If I wanted to add a delay at the source until the AGV leaves is this possible. The Packages will not be on a continuous process and the AGV must wait at this destination until the packages arrive.

Thanks for your help!

0 Likes
Accepted solutions (1)
1 View
1 Reply
Reply (1)
Message 2 of 2

rodrigo_lamas
Not applicable
Accepted solution
@Paddy Hands

Please see the AGV template by @anthony.johnson this model enumerates many of the control point connections and path configurations you might use in an AGV model when using these template process flows. I hope can be helpfull. Regards! https://answers.flexsim.com/articles/23899/agv-template-process-flows-for-161.html