Exam Table schedule

I'm running an experiment to analyze exam room utilization. When I look at the utilization stats on the dashboard, it seems to be calculating the percentage based on a 24-hour schedule. How can I set the schedule for the exam rooms (7:45am-6pm) to make my utilization stats more realistic?

healthcare
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Karen Measells avatar image
0 Likes"
Karen Measells answered

Nevermind - I figured out how to create a new shift schedule for the locations. Thanks anyway!