How to close a port when there are two flow items on a decision point?

simulacion-run-test-ra1436aj1na.fsmI want to close the "amarre de cables" port when two flow items are accumulated at the first decision point, and once they are not accumulated in the first decision point open the "amarre de cables" port

FlexSim 18.1.0
decision pointscloseoutputcloseoutputport
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Joshua S avatar image
1 Like"
Joshua S answered

I added a zoned process flow block of activities and had that control the creation of the boxes, hope this is what you are looking for.13836-simulacion-run-test-ra1436aj1na.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.