question

Christian W avatar image
0 Likes"
Christian W asked Victor Alejandro HT answered

Is there a simple way to make a crane require an operator?

I am making a simulation to determine if one operator is sufficient or if two will be required, I would like to make a few simple changes to go from the two operators to one, however I have been unable to make the crane stop functions while other processes are underway.

Choose One
operatorscrane
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Joseph Gillespie avatar image
0 Likes"
Joseph Gillespie answered Braydn T commented

Hi @Christian W,

One possible solution would be to use process flow to stop the crane or require it to acquire an operator (as a resource) before proceeding.

If you provide us with more detail or with your model we could give you a more specific answer.

· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Braydn T avatar image Braydn T commented ·
@Christian W

Did Josephs answer help you? If so, could you please accept his answer? If not, could you let us know what else we can do to help you?

0 Likes 0 ·
Victor Alejandro HT avatar image
0 Likes"
Victor Alejandro HT answered

Hi @Christian W,

Perhaps this model could help you, is working with only one operator and one using PF.

Regards

Alejandro

crane-and-operator.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.