Hello, Is there any way to prevent deadlock without using process flow? In the attach model, at time 669.5,"car3" and "Mazada 3" have been deadlock, but what i want to do is let "car3" leave control area 1 first, then "Mazada 3" go into control area 1,but i dont know why it cant be implement.
Thanks for the help,wish you a good day.