How can I run a simulation at specific times of the day for a month? Suppose I have simulated a construction project and I want to determine the completion time of the project. How is it possible?

FlexSim 22.2.0
simulation at specific times of the day
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeanette F avatar image Jeanette F ♦♦ commented ·

Hi @sadegh,

Thank you for contributing to our community! We couldn't identify a maintained license or subscription linked to your account.

You may need to update your profile information to identify yourself as a license owner or their associate. Check out our article for how to ensure you receive timely support. If you update your profile comment back to let us know - we'll adjust the priority of your post accordingly.

0 Likes 0 ·
Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered

You can use a time table to stop objects from working during specified time intervals.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

sadegh avatar image
0 Likes"
sadegh answered

Do you have a similar project that I can get ideas from?

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

sadegh avatar image
0 Likes"
sadegh answered

Thank you

I am training and I will let you know as soon as I finish learning and get my license.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.