Preventive Maintenance & breakdowns

Hello,


Can someone please guide me to setup the monthly PM Schedule, time taken for PM for the processors as well as the breakdown rate & the corresponding time taken to fix the machines during each breakdown in the model? Thanks!

flexsim-Skate Flow-328-copy-1.fsm


Regards,

Harish

FlexSim 22.1.0
maintenance
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ryan Clark avatar image Ryan Clark commented ·

Hi @Harish G, was Jason Lightfoot's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

·
Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered

Use the Toobox's MTBF/MTTR tool for breakdowns and the Timetable tool for PM.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.