Ahmad_zulfy A avatar image
1 Like"
Ahmad_zulfy A asked Jeanette F commented

Processor sync

orlando automation 2 case 2.fsmProcessor 9 can run after processor 11 start running and process _11 run when processor _9 run... so the processor _9 & _11 run at same time. but at the first cycle processor _9 run and processor _11 not run together because ther is no load at [rpcessor _11 when Processor 9 run for forst cycle. How to make the syncronization ?

FlexSim 23.0.0
synchronization
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jeanette F avatar image Jeanette F ♦♦ commented ·

Hello @Ahmad_zulfy A,

Processor 11 is downstream from Processor 9. An item would have to go through Processor 9 first and then they could sync for the rest of the processing events. The other interesting thing is that you have two processors in the 10 position but with your synchronization requirement there would only be one item in step 10 at a time.

0 Likes 0 ·
Ahmad_zulfy A avatar image Ahmad_zulfy A Jeanette F ♦♦ commented ·

im sorry, i mean the syncronization between processor _7 and _9. Processor _7 capasity is 1 then place to processor _8 top or above. and processor _9 capasity is 2 then place to processor _10 top & above

1678687929774.png

0 Likes 0 ·
1678687929774.png (151.3 KiB)
Jeanette F avatar image Jeanette F ♦♦ Ahmad_zulfy A commented ·

Hello @Ahmad_zulfy A,

I am still facing a similar issue that I described above. Except now Processor 7 needs to process twice for every one time processor 9 does. Considering they are supposed to process together but they have this restriction, Can the just sync every other item in processor 7 after the first two items have passed through processor 7.

0 Likes 0 ·