I'm working on a case study with large and heavy flow items that need to be moving across the model by a crane and because the items are large two operators must work together at the same time when moving one flow item with the crane. I don't know how to use 2 operators in a crane and I would appreciate any suggestions.
I have a simple model with a dispatcher connected to 2 operators at the end, however I haven't found out how to solve this problem. I will upload the model anyway.
Thanks in advancetest process flow.fsm