Hi,
Basically, a processor needs 2 operators to perform the process for certain duration of time. If one operator goes for a break, only one operator will continue to work unless there is any available operator to cover the break. In case if only one operator works at the processor, the process time should be longer double. Could someone help me make a sample model? Thanks.