question

sarapax avatar image
0 Likes"
sarapax asked Jeanette F commented

Warehouse 3d model+ProcessFlow Problem conecction

TrabajoV2_autosave.fsmI'm building a warehouse model where I receive boxes from three different locations. However, I'm encountering an issue where I want to store them from the RECEIVED queue, but I'm having trouble properly connecting the model. The operators are going to the initial queues to pick up the boxes instead of retrieving them from where they should.

FlexSim 23.0.12
rackwarehouseprocesss flow
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered

After the items are unloaded to the conveyor, the token in the Process Flow immediately moves onto the next section that tells the operators to load the items and move them to the racks.

You can use a "Wait for Event" activity to delay the token until the item has arrived in the "RECEIVED" queue.

1705909674691.png


1705909674691.png (16.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.