Hi,
I am trying to simulate stamping line and it consist of 5 stamping machines strike rate 530strikes/hour so it means stamping proces should be 6.8seconds but staytime is like 9.5sec. I suppose its because of robot moving item in and out. In reality the whole process takes 6.8sec because as the die sets is going up robot already picking the part. I just wanna ask if there is some solutions to this because all i came up is to combine loading and procesing time manualy to get 6.8 sec stamping time.
There is the model current_state.fsm
Thanks for help