Hey guys,
I would like to know if it is possible to create the following situation from a GUI:
Where I work there are 4 production lines. Two of them are dedicated and are always configured the same way, but two of them are hybrid.
Lines that are hybrid run two different products, with different processes.
I'm doing a study on the amount of AMR, so I need to evaluate all the scenarios and I thought about making this change in the hybrid lines scenario using a GUI.
I don't know if I was able to be clear, but if possible, could someone guide me?
Thank you very much