question

Dilla Da avatar image
0 Likes"
Dilla Da asked Felix Möhlmann commented

ASSIGNMENT OF OBJECTS ON AVAILABLE APRONS/QUEUE

simulasi-pesawat2.fsm86057-f.png

How to create a processflow with the following conditions:

1. Mean exponential distribution inter-plane arrival time:120 s.

2. If every plane that arrives occupies an empty/unoccupied apron.

3. The aircraft's residence time on the apron is 60 minutes.

4. Simulation time 15 days.

5. Display Output Apronon the dashboard Table and Graphic.

FlexSim 22.2.0
queuedashboardsprocesss flow
86057-f.png (103.4 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered Felix Möhlmann commented

The basic tutorial contains everything you need to build this model and in fact describes how to build a model that is conceptually very similar to yours.

You only need to add the aprons to a group and link that group to a process flow resource. Then each token acquires an apron, has the airplane travel there, delay and later release the resource and remove the plane.

1725343088236.png

For the statistic, you can use an Output By Type chart linked to the Release activity and using the "resource" label to differentiate the entries by.

1725343149244.png


1725343088236.png (20.9 KiB)
1725343149244.png (2.1 KiB)
· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Dilla Da avatar image Dilla Da commented ·

Thanks for you are answer. Before that, How add the aprons to a group and link that group to a process flow resource?

0 Likes 0 ·
Felix Möhlmann avatar image Felix Möhlmann Dilla Da commented ·
That is also covered in the tutorial. Add a group in the toolbox then use the sampling tool in the group GUI to add objects to the group.

After adding a Resource activity to the Process Flow, use the sampling tool of the "Reference" field on the group.

0 Likes 0 ·