Hi Team,
Currently, my model shows totes coming down the conveyor, then the operator will take the cartons from within the totes and place them accordingly on the rack inside totes. Is there a way to put a limit on the number of cartons in the rack?
I'd like to get the operator to take the tote from the rack once there are 15 cartons inside and place the tote (completed order) back on a conveyor to take it to the sink. In reality it will be processed in another section of the warehouse so the sink will signify the end of the simulation. Once the completed order is taken from the rack, I'll need the operator to grab an empty tote and replace the location so orders can continue to be placed in the rack.
Is this possible? Let me know if any clarification is necessary. I can also attach my model.
TIA!