Hi,
I would like to load and unload two items from a rack using an ASRS vehicle.
After loading the first item, can I make the lift go to load the second item without returning to directly above the rail?
Then, with both items still on the lift, can I move to the queue, unload the first item, and then unload the second item without the lift returning to directly above the rail?
I tried moving the lift by specifying coordinates using "Travel To Location" in the ProcessFlow, but when I repeated "Travel To Location" twice, the lift returned to directly above the rail between the first and second movements.
Thanks in advance.