question

Nosaiba avatar image
0 Likes"
Nosaiba asked Nosaiba answered

How to define task sequence for an operator

Hello,

this is my first simulation model using flexsim and I am learning by myself, I have two workstation and two operators, operators do the transportation from queue to workstation, perform the task then transport it to a rack. when each operator finished his/her task, s/he needs to check the work of the another operator . how to set the sequence of the tasks for each operator. right now, the opertro transport the item to workstation go to rack and check the finished item by another operator then back to his workstation to perform the job.....any help please?

Thanks

FlexSim 17.0.2
task sequence done by an operator
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Nosaiba avatar image
0 Likes"
Nosaiba answered

help.fsm (469.0 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.