Changing the Count of Resource Dynamically

I want to change the active number of resources on basis of time lapsed using process flow.

i.e. On Day 1- 10 People will work, On Day 2- 5 People will work and on next day 7 and so on.

Can you please help me with this?

FlexSim 18.1.1
process flow resourcesdynamic selection of resources
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
jing.c avatar image
3 Likes"
jing.c answered Aaditya J commented
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Aaditya J avatar image Aaditya J commented ·

I am trying with the Lists, if it does not work then I will use one of the above approaches.

1 Like 1 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.