Priority of activity on operator

I have a queastion about operator activity. Can I set list of activity which my operator can do it?

FlexSim 17.1.6
process flowoperatorspriority
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
tannerp avatar image
0 Likes"
tannerp answered

Hi @Kamil P,

Will your list contain a group of activities that a certain operator can perform? Or will the list contain a group of operators that can perform a certain activity?

If your are looking to have a group of operators that can perform certain tasks, I would simply use Groups and then Acquire Resource activities in Process Flow that will acquire operators from the designated Groups.

Let us know more about your model and we can provide additional help.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.