question

Larissa M3 avatar image
0 Likes"
Larissa M3 asked zacharyh commented

Two operators working in parallel and independent on the same item type

Imagine a manual station of window gluing in a automotive assembly line. Cycle time of 14 minutes. Two operators, each one has his separate tasks, like pre assemblies and rear/ front window preparation. When they have to fit the window on the body, they need both working together.

I tried multiprocessor, but it has the process one followed by the next. I have to make both operators work independently in the same itemtype and at two points work together also in the same itemtype.

The assembly line is stop and go.

FlexSim 19.1.0
assembly station
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Sebastian Hemmann avatar image
0 Likes"
Sebastian Hemmann answered zacharyh commented

Sounds as if you should build the processes (times) in Process Flow and Synchronize the parts the operators have to do together. Using a list would be the best way I think.

If you want further information or any help, please share a(n) (example-) model with us!

· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Larissa M3 avatar image Larissa M3 commented ·

This is a very simple model of what I want to do. modelo3-flexsim.fsm

In the processor, I added some of the activities. But the pre assemblies, both operator can do at the same time, it does not have to follow a sequence.

The model does not even work like that.

0 Likes 0 ·
modelo3-flexsim.fsm (46.1 KiB)
zacharyh avatar image zacharyh ♦ Larissa M3 commented ·

@Larissa M3

When looking at your model the you should just be referencing the dispatcher to handle which operator will work on a task. I have changed that in the model I have attached. (Just for visual I had the item change color after each task.) As for working on an item at the same time Sebastian's answer works very well. In his case you could also use a Synchronize Activity instead of the "Sync List." (There is a tutorial that you can view to help build a model with the Sync Activity.)

modelo3-flexsim.fsm

0 Likes 0 ·
modelo3-flexsim.fsm (40.0 KiB)
Sebastian Hemmann avatar image Sebastian Hemmann commented ·

So I´ve attached a model that hopefully meets your needs.

You can add further Processes or Sync Processes. Hope you can Figure out, what I did!?

19299-modelo3-flexsim-sh.fsm

0 Likes 0 ·

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.