sample-operator-work.fsm The machine CT is 24s.
1. The operator takes the component from the queue.
2. It takes 12s to manually pre-assemble the component he takes from the queue
3. While the operator is forced to wait 24s, he can go back to the queue and use the 12s to pre-assemble and be ready to load it to the machine when it is done.
Is there a way I could simulate this scenario?