I am not able to locate Tracked Variable Tab. Where to find this Tab. Could you guide me on this.
I am not able to locate Tracked Variable Tab. Where to find this Tab. Could you guide me on this.
Tracked Variables are accessed from the Toolbox:
See https://docs.flexsim.com/en/20.0/Reference/Tools/TrackedVariables/
@phil.bobo Thanks for your response.
As you can see in the below image,
In Tracked Variables we can add Queues and in dashboard Content vs Time chart is plotted. I am looking this kind of chart.
I found this model when I am looking for the answer, attaching model for your reference
That's a legacy chart from before the Statistics Collector was added to FlexSim. That's an old 'Tracked Variable Vs Time' chart.
If you want a line chart of your content over time, drag a WIP Vs Time chart into the Dashboard:
You can name it Content vs Time if you want.
If you want to a Tracked Variable plotted on a line chart, press the Pin button on the Tracked Variables window to pin it to the dashboard as a line chart. In the recent version of FlexSim, that will use a new Chart Template tool. In older versions of FlexSim, that would use the legacy charts.
12 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved