create a system pulled by forecast sales without using a process flow

Hello, I want to model on Flexsim a system pulled by forecast sales spread over a week (for example 50 product required for saturday, 100 for sunday etc) and I don't know how I can model this on Flexsim. I thank you in advance for your help.

FlexSim 21.0.0
flexsim modelingsystem pulled by forecast sales
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ben Wilson avatar image Ben Wilson ♦♦ commented ·

Hi @Célia LI, was Parker S's answer helpful? If so, please click the red "Accept" button on their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

·
Parker S avatar image
0 Likes"
Parker S answered Ralf Gruber commented

Hi @Célia LI

I'm not entirely sure what you're asking.

You can use an arrival table to determine how many items enter the model at a given time by changing the arrival style on a source to Arrival Schedule

and then determine how many items per day (this model's time units are hours) in Edit Table

Is this what you are looking for?


1605034057976.png (5.0 KiB)
1605034322098.png (15.2 KiB)
· 4
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Célia LI avatar image Célia LI commented ·

Ok thank you, I was looking for a way to avoid using a process flow but if it is the only solution I will do it like that !

1 Like 1 ·
Ralf Gruber avatar image Ralf Gruber ♦ Célia LI commented ·

Celia,

the concept of Lists is available in 3D modelling as well, not in Process Flow only:

2020111_List_Example.fsm

You will want to check the user manual´s "Working With Lists" topic.

Best wishes

0 Likes 0 ·
Célia LI avatar image Célia LI commented ·

I thank you for your response. I initially modeled it like this (using arrival schedule) but in that case I think that it would be a push strategy and not a pull one (because it starts from the source). I am rather looking for a way to start it from the final stock and then go up gradually to the source, if it is possible. I have to model a company based on a pull system.

0 Likes 0 ·
Parker S avatar image Parker S ♦ Célia LI commented ·

Ah, I see. I believe this could be done with ProcessFlow, using a list for product inventory and a Pull from List activity acting as the product sales.


0 Likes 0 ·