Operaters go and have a break if his operating time more than 60 seconds

Dear everyone,

The operators need to go to Shape2 for 20 seconds rest when his operating time more than 60 seconds. I need your help.

Thank you in advance!

have a rest by time.fsm

FlexSim 21.0.2
flexsim 21.0.2simulation
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jason Lightfoot avatar image Jason Lightfoot ♦♦ commented ·

Is the 60 seconds rule cumulative or only per job?

0 Likes 0 ·
Yuanming Z avatar image Yuanming Z Jason Lightfoot ♦♦ commented ·

It's rule cumulative. The processtime is not the same, like 10s,20s,30s,40s,50s.Thanks!

0 Likes 0 ·
Eric M avatar image Eric M commented ·

Hi @Yuanming Z, was Jörg Vogel's answer helpful? If so, please click the red "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered CSN commented

That is a feature of MTBF/MTTR tool. You can apply the count of time to a state or set of states for each member individually. You apply the time before failure only to the state “processing”. First Failure and Mean Time Before Failure is each 60 seconds, Time to Repair is 20 seconds. You call On Down the associated Operator of the Member at centerObject[1].

· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Joerg Vogel avatar image Joerg Vogel commented ·

Naturally you exchange the down state to scheduled down or just break.

0 Likes 0 ·
Yuanming Z avatar image Yuanming Z Joerg Vogel commented ·

I had tried to use MTBF/MTTR tool. And operator only stop instead of going to Shape2. If you have other advices or questions. Please let me know. Thanks!

0 Likes 0 ·
CSN avatar image CSN Yuanming Z commented ·

Hi,

If you use MTBF/MTTR tool. You need to change Down Function Logic.

You can also consider using Time Table tool.It has similar logic to what you need.Here are the Settings :

Last,you can also try the Processflow tool .There are similar cases to learn from.

https://docs.flexsim.com/en/21.0/Tutorials/ProcessFlow/Tutorial1UsingSharedAssets/UsingSharedAssetsOverview/

0 Likes 0 ·