Can process flow override dispatcher?
Can process flow override dispatcher?
You can push tasksequences to a global list and let process flow dispatch by pulling these tasksequences from this list.
Let's assume you have operators (task executer) go between processers and multiple sinks. I want to do 3 things. First: I want the operators to set on the chair after delivering the package for 5 sec to the processer without using the dispatcher. Second: I want to replace it by going to have a tea break by setting down every 2 hrs without dispatcher. Finally: I want them to switch between machines regardless of the items there (e.g. first queue, then second queue) with the existence of the dispatcher connection. 3control_operator2.fsm
8 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved