Hi:
I have an operator serving two machines, and I want to know his status over time. I used a state plot to do the job. The result is as follows.
However, the status does not match the working condition of the operator. The state pie chart shows his utilization is about 25.89%, but the time plot shows only a few percentages of his time is working. Can I change the state time plot to reflect the actual working (utilization) condition? The flexsim program is attached. Primer_2-5B-compare.fsm