Raynan avatar image
0 Likes"
Raynan asked Jason Lightfoot commented

restaurant model with two entrances (front and back

simulacao-restaurante-2-fm.fsmI'm building a model of a restaurant with two entrances (front and back). I managed to build the model through Flow Item, and I will leave it attached below, but I was only able to add the front entrance to the model. I would like to know if I can put the back entrance (source 2), because I need people entering the restaurant from both sides. I have the data, but I can't make the model I idealized using Flow Item work, as in the first one (source 1).

FlexSim 22.2.0
processs flowrestaurantdual arrival
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Jason Lightfoot avatar image Jason Lightfoot ♦♦ commented ·

Hi @Raynan, was Matheus Coelho's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always comment back to reopen your question.

0 Likes 0 ·

1 Answer

Matheus Coelho avatar image
0 Likes"
Matheus Coelho answered Matheus Coelho commented

Hi, Raynan! That's some ways to do this. So, for two entrances you could set a decide before de create person and reference a each source in each create person. But, it appears a visual bug, when i did this. So i change the 3D sources for 3D Entrances and reference them.

1699473835280.png


You can customize the decision criteria, if you need. I set random port 50/50.

simulacao-restaurante-2-fm_Ajuste.fsm


· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Raynan avatar image Raynan commented ·

Just so I can understand, you duplicate Create Person, but the way the system is creating the entities is still governed only by global table 1, right? If I want Entrace 2 to be governed by a Global Table 2, independent of the first, is it possible?

Thank you for your attention.

0 Likes 0 ·
Matheus Coelho avatar image Matheus Coelho Raynan commented ·
Yes, i didnt change the method you're using to create people. You can create another schedule source (ProcessFlow) and link with a Global table 2, and use a independent subFlow to create people at Entrance2.