I'm making a model where the berth has capacity for 2 barges. However, when the barges have the same schedule, there is an error in the logic and the barges get stuck in the berth. Could anyone help me with this problem?
I'm making a model where the berth has capacity for 2 barges. However, when the barges have the same schedule, there is an error in the logic and the barges get stuck in the berth. Could anyone help me with this problem?
Hi @Kelvin Barbosa ,
This looks to be a rare bug. In this case we are connecting a tank to a loading arm, at the exact same time as when we disconnected the loading arm from another tank. Since this new tank is created in a FlowItem this new tank is not connected to the FlowControl object. This is automatically done when the tank is connected to the loading arm. However, the event on which the tank is full is not created.
Short summary: this is a bug that we will fix. For now you can add a breathe (delay activity with time 0) after the "Wait for Full activity". This will fix the issue.
16 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved