question

hoooo avatar image
0 Likes"
hoooo asked hoooo answered

Moving Items to a Combiner from Multiple Queues


Hello,

I am having trouble with a process where I want to move boxes to a combiner for packing as soon as a specified quantity (in this case, three) is reached in each of three queues.

I want to move the boxes from the queue that reaches the specified quantity first.


For example: When Queue 2 accumulates three boxes, Operator 2 moves the boxes to the combiner for packing.

The same applies to Queue 3 and Queue 4.


Please help me.
240926_combiner.fsm

FlexSim 23.1.4
combiners
240926-combiner.fsm (55.6 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Felix Möhlmann avatar image
0 Likes"
Felix Möhlmann answered

The easiest solution would be to connect the three queues to another queue first and that to the combiner.

240926-combiner_1.fsm


5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

hoooo avatar image
0 Likes"
hoooo answered

@Felix Möhlmann

Awesome!!

I understand that I should think in that way. Thank you!!

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.