oprtor.fsmThere is a lathe machine, which pulls one part at a time contains the following cycle:
a) Initialize – 2.5 - 4.5 min (uniformly distributed)
b) Machining – 9 - 13 min (uniformly distributed)
c) Cleaning & Removing – 2- 4 min(uniformly distributed)
An operator is needed for cycle 1 and 3, to utilize the operator in his idle time, he is engaged on another single machine which pulls part 2.
Arrival pattern of part 2 is in the following pattern, Inter arrival time – 5-15 min(uniformly distributed)
Lot size – 1
Cycle time of the machine – 1-5 min
How do I use operator in this case.
Thank You.