Hello,
In floor storage I am stacking maximum 8 items in one cell location. When their will be 4 stacks with 8 items in individual cells in the floor storage area, gantry should starts task sequence to unload all 4 stacks (32 items) in the queue. Maximum capacity of gantry is 4 items when loading from floor storage.
Task sequence of gantry for floor storage:
1) Task sequence trigger starts: when their will be 4 stacks (32 items)of 8 items in individual cell in floor storage
2) Gantry load: Gantry loads maximum 4 items and unload in the queue.
3) Repeat step 2 for 7 more times for completely unloading 32 items in the queue.
4) Gantry back to one item load / unload task from conveyor into floor storage area.
5) Again task sequence triggers when their will 4 stacks of 8 items in the floor storage (Step 1 to 4)
MODEL ATTACHED.
Can someone please guide me how I can do this in 3d or using process flow?
Thank you.
Pragnesh