question

Pui Fong C avatar image
0 Likes"
Pui Fong C asked tannerp commented

How to stop the TE to prevent it from leaving the charging area?

TE will quit the charging area once there is a new task. Is there code to reject the new task or lock the TE before the battery reach a target level?

FlexSim 18.1.1
task executerzonedelaycharging
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

Can you describe, how you control the AGV? Do you use the Process Flow template? Do youhave built the model by a tutorial and control the behavior in triggers of the objects?

The quick answer is: give the taskexecuter something else to do, like a delay task or a utilize task by dispatching a own created tasksequence or by an activity.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.