question

Mariana F2 avatar image
0 Likes"
Mariana F2 asked Isaac Litster edited

How to send an information to a task executer to select an item

We have 9 types of engines and need to pick up 24 engines and put in a combiner according to a production sequence (we have the percentage use of each engine). How can we send the information to the task executer do this activity?

@Paula Carneiro Martins

FlexSim 18.1.1
production sequencesend a information to a task executer
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

Flexsim works a bit different. You can tweak FlexSim to behave as you like if you build your complete logic in ProcessFlow. Typically you don't need task executers at all. They support your model. They transport items, or they assist a process or setting up a machine. But before they do this the model distribution should already be finished. I mean the objects previous to the combiner send the items you need to assembly an engine. How many or how often the type of an engine to build changes depends on the previous objects. If the logic works as you wishes, you tell the objects, which send items, to Use Transport by an object option.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.