question

julian S3 avatar image
0 Likes"
julian S3 asked julian S3 answered

Retrieve orders from the same rack

¿How does the operator of the same rack take units for different orders?

For example: for rack 1, take 2 units of order 1, 3 of order 2 and 5 of order 3, in total rack1: 10 units.

For Rack 2, take 7 units of order1, 1 of order 2 and 5 of order 3, in total Rack 2: 13 units, the above successively until ending in rack 5, This means a pick-up order entirely by the operator.

I attach the scale model, Thank you very much for the help¡¡

order.fsm

FlexSim 19.2.1
orders taken from the same rack
captura2.png (7.3 KiB)
order.fsm (42.6 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

tannerp avatar image
0 Likes"
tannerp answered
@julian S3

You had the right idea with the Process Flow looping. There were just a couple things that needed to be adjusted. The "medicamentos" label is incremented properly, but it can't be used as a column reference because after the label reaches 4, there are no columns after column 3 and it causes a problem. I adjusted that as well as some other parts here and there. Hopefully this does what you're looking for it to do.

orders-help.fsm


orders-help.fsm (40.3 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

julian S3 avatar image
0 Likes"
julian S3 answered

cordial greetings to all

When I run the model, I observe that the operator only takes 5 units of Rack 1, but the operator should take 10 in total:

2 units of the order 1.

3 units of order 2 and 5 units of the order 3.

Once rack 1 is finished, take units from rack 2 as indicated by globaltable1, until finishing in rack 5 and deliver in the queue.

How do you help me with the model?

Thank you

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

julian S3 avatar image
0 Likes"
julian S3 answered

Hello tanner thanks

When I run the model, I observe that the operator only takes 5 units of Rack 1, but the operator should take 10 in total:

2 units of the order 1.

3 units of order 2 and 5 units of the order 3.

Once rack 1 is finished, take units from rack 2 as indicated by globaltable1, until finishing in rack 5 and deliver in the queue.

How do you help me with the model?

Thank you

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.