Hi, in my simulation, I need two robots on the same track to perform material handling for all the processors. Using process flow, I were able to simulation one robot on one AGV, where the AGV simulated the track. I added the second group to the path, but couldn't get it work. I tired to group the two AGVs and two robots and linked those two groups to different resources. But I realized that, by doing this, the token may acquire one AGV but the robot from another AGV, which would cause logistic issue. How could I make two robots on the same track work in this case? The simulation file is attached. Thanks!