proyecto-final-version-sintetizada-6.fsm
I would like the same operator "A" executes the two tasks "Corte de Fibra" & "Corte de Consumibles" in an specific order according assigned priority level.
Thanks,
© 1993- FlexSim Software Products, Inc. All Rights Reserved.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.