question

Abubacker S avatar image
0 Likes"
Abubacker S asked Abubacker S commented

How to consider the downtime as it is in the downtime schedule ?

I have a downtime log of one-year data.

When I feed the data in the downtime table and assign it for a FlowSource member, the model is not considering as per the log. Instead, FlexSim is accumulating all the time and making the member idle (down) only during a certain period. Look at the trend below:

All those small times 360,760,... mins were accumulated and downtime in simulation is appearing after a few months, Is there any way FlexSim can consider this downtime schedule as it is in the downtime table ?

FlexSim 20.0.3
downtime
1.jpg (70.2 KiB)
2.jpg (29.0 KiB)
3.jpg (25.8 KiB)
4.jpg (22.2 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Matthew Gillespie avatar image
1 Like"
Matthew Gillespie answered Abubacker S commented

Can you attach your model? Your timetable looks fine from the pictures you've posted. There's probably some interaction of events going on in the model causing your issue.

· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Abubacker S avatar image Abubacker S commented ·

@Matthew Gillespieyou're right, sorry for this post, I request to remove this.

0 Likes 0 ·