Hi. In the attached model I use 3 operators in order to pick orders on a single pallet. Each operator has its own dedicated Rack and PickingList. Operator1 works correctly. The pallets stops in the DP1 and after loading the boxes, the pallets goes to DP2 so that the Operator2 loads its items. But unfortunately he can't travel to Rack2 and take the item. I have made all the changes to the process flow but I can't achieve that. Any ideas ?
Thanks in advance.