how to add a demand and set shifts in a model?

FlexSim 20.2.0
flexsim 20.2.0flexim
· 3
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

tannerp avatar image
0 Likes"
tannerp answered tannerp commented

@mayra_itzel.rr,

You can use a source to create the raw material each Monday at 6:00 AM. I set up a simple example model that does this. In the Process Flow "Source" activity, 100 items arrive every day at 6:00 AM.

The shifts can be set up using Time Tables, as I mentioned. I also incorporated a simple Time Table into the example model. The yellow operator works from 6:00 AM - 9:00 AM and the blue operator works from 9:00 AM - 12:00 PM.

I hope this helps!