I have a production model that will gradually increase the number of products given/made over the course of the year, so in the beginning I may only need 5 people to build 10 products. But by month two I am building 45 products and may need 20 people. Is there a way to represent that in the 3D Model?

there are some stations in the model that must be manned all the time even if they are not involved during the process time. There are other stations that one person would man 3 because of the offset time between all 3. I currently have each processor/combiner calling for a specific operator and am not sure how to change it so it will call a different person after X days.

FlexSim 20.0.9
operators3d modelflexsim 20.0.9operators assignment
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Ben Wilson avatar image Ben Wilson ♦♦ commented ·

Hi @Savannah, was jason.lightfoot's answer helpful? If so, please click the red "Accept" button on their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

Jason Lightfoot avatar image
0 Likes"
Jason Lightfoot answered

If you use a dispatcher you can have the team of 20 connected to that with some of them starting in a stopped state and resuming later in the run.

You can set the states in the date-based timetable/calendar or use some other process to resume them eg. process flow.