Makenna A asked Joerg Vogel answered

AGV Automatic Travel to task

Right now, I have an AGV picking up an object from processor 1 and taking it to processor 2. The AGV will not return to processor 1 until the object is done processing. Can I change this so that the AGV immediately starts traveling to processor 1 after dropping of at processor 2?

FlexSim 21.1.0
flexsim 21.1.0
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

·
Joerg Vogel avatar image
0 Likes"
Joerg Vogel answered

You let him travel on the event On Unloading to the other processor. As a trigger there should by a template property to achieve this.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.