How can I describe in ProcessFlow

How can I describe in ProcessFlow for an operator to wait for the end of another operator's activity on the processor?
FlexSim 19.0.0
flexsim 19.0.0operator wait
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Caraiman C avatar image Caraiman C commented ·

This is ProcessFlow

0 Likes 0 ·
3.jpg (66.0 KiB)

1 Answer

·
Jeanette F avatar image
0 Likes"
Jeanette F answered Jeanette F commented

Hello @Caraiman C

Wait for event's sound like they would be the best fit. If the first operator is doing set up then you can set for the next operator to wait for on setup finish. You can also connect the wait for event to other activities in your process flow. For instance the second operators wait for event can look at the Travel activity of the first operator and wait for a token to enter that activity.

· 2
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Caraiman C avatar image Caraiman C commented ·
And how could I do that? could you take me some screenshots? I am not very experienced in using the software. Please!
0 Likes 0 ·
Jeanette F avatar image Jeanette F ♦♦ Caraiman C commented ·

Pull a wait for event activity into the process flow and use the dropper to select another activity. From there you can decide what event with that activity you will wait for.

0 Likes 0 ·