Hi good day,
I have question regarding AGV , I tried to modelling a Tugger with AGV and Process Flow
I sadly havent make the smaller model I can uploaded here. Really hoping with small pointer i can find my mistake first.
First Question :
I have these big loop with many control point for pickup and drop off item (usingLookingfor next work connection)
But once in a while AGV will just stop traveling and getting stuck without any error notification.
As you can see at the picture attached, the agv I highligted's status is "traveled loaded" but it just stay still.
1. I already have parking spot (dont know if there is something wrong)
2.The process in the picture is picking up trolley, after that it should go to the drop off poin (the drop off point already connected and work with other agv achieve to drop the item there"
This is the Flow Process Token for the stuck agv
Second Question
How I can make my AGV drop all it's item at the same dropoff location point?
1. I add 5 drop off points like in the tutorial for 1 main drop off point
2. But every time, the AGV will just only drop 1 item, and then go along the way the loop to drop again in the same place for the next item.
When it should have drop all of the in the same location (given if the drop off location is the same, I have 2 main drop off location)
for work around, I make an infinite looping of path, so after 1 dropoff it will going in a smaler loop to the mainldropofflocation instead of going all around the big loop.
Hoping for some insight what i did wrong with these little information
Thank you