How can I reset this State Gantt everyday at midgnight ?

Hi !

I created a State Gantt for my resources. I run my simulation for an entire month... which makes the graph unreadable. How can I reset this State Gantt everyday at midgnight ?

Thanks in advance,

Leah

FlexSim 21.0.10
state gantt
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

1 Answer

Pierre G avatar image
2 Likes"
Pierre G answered Leah R commented

Hi,

I think that you don't need to reset your State Gantt.


You should just use the Time Window option of the GANTT to see the period you need :

option.png

Then, you will be able to move the scroll bar to change the period you're watching :

1649767874144.png

You also can move the extremities of the scroll bar to change the period's length :

1649767961182.png


Tell me if this answer resolves your problem.


option.png (2.9 KiB)
1649767874144.png (8.3 KiB)
1649767961182.png (8.4 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Leah R avatar image Leah R commented ·
Thank you it works perfectly !