question

Jia_yu L avatar image
0 Likes"
Jia_yu L asked Andrew O commented

AGV logic

We want to build a process flow if AGV is idle and it go through a queue which contain item ,AGV could load item immediately.

For example,when AGV carry item to destination (red circle) and unload item,AGV should load next item at yellow circle.
1661443751359.png
1661443964338.png

1661443987582.png

FlexSim 20.0.10
agvprocessflow
1661443751359.png (367.5 KiB)
1661443964338.png (211.3 KiB)
1661443987582.png (107.1 KiB)
· 1
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Andrew O avatar image Andrew O ♦ commented ·

Hi @Jia_yu L, was Kavika F's answer helpful? If so, please click the "Accept" button at the bottom of their answer. Or if you still have questions, add a comment and we'll continue the conversation.

If we haven't heard back from you within 3 business days we'll auto-accept an answer, but you can always unaccept and comment back to reopen your question.

0 Likes 0 ·

1 Answer

·
Kavika F avatar image
0 Likes"
Kavika F answered

Make sure that the next point you want to pick up from (the yellow circle) is part of the NextWorkPoint cycle in your model. You can reference this table on different connections and this paragraph on Creating Work Loops.

5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.